Workspace.
Active engagements, prediction cycles, and conformant releases. The example below is a live Battery Life Cycle Prediction engagement under the Sim-B program.
● Live preview · current engagement: Battery Life Cycle Prediction · F.01
- Cycles completed
03
of 06 planned
- Predictions released
12
all conformant
- Open assumptions
02
under review
- Next audit
2026
09
Status values shown are illustrative of an active workspace. Real engagements render live values.
§ 01 / Engagement
GS-2026 / SECT_01
Engagement profile.
| Engagement ID | PAaaS-E.01 |
|---|---|
| Application | Battery Life Cycle Prediction |
| Programs | Sim-B (Simulation – Battery Systems) · QMS-B (Battery materials) |
| Engagement opened | 2026 · 06 · 01 |
| Current cycle | C.03 of planned C.06 |
| Operating regime | Cell-to-pack thermal · electrochemical response · lifecycle prediction |
| Whitepaper template | Conformant (§7.6.1) |
| Validation discipline | Applied (§7.3.2 — six rules) |
| Methodology audit | Pending C.06 closure |
§ 02 / Active prediction runs
GS-2026 / SECT_02
Prediction runs.
Each run carries a parameter set, a model version, a convergence state, and a published uncertainty bound. Runs without all four entries are flagged before they reach the customer surface.
| Run | Date | Solver | Model version | State | Uncertainty bound | Status |
|---|---|---|---|---|---|---|
| R.012 | 2026 · 08 · 14 | Sim-B / DFT+MPS | sim-b · v0.4.2 | Converged | ± 4.2 % capacity | Released |
| R.011 | 2026 · 08 · 09 | Sim-B / DFT+MPS | sim-b · v0.4.2 | Converged | ± 5.8 % capacity | Released |
| R.010 | 2026 · 07 · 31 | Sim-B / DFT | sim-b · v0.4.1 | Converged | ± 7.1 % capacity | Released |
| R.009 | 2026 · 07 · 21 | Sim-B / DFT | sim-b · v0.4.1 | Non-converged | — | Labelled (not silently discarded) |
Sample workspace state. Real engagements show only the customer's own runs.
§ 03 / Validation summary
GS-2026 / SECT_03
Observed-vs-predicted closure.
Validation against measurement is the institutional standard. Where measurement data exists, the gap between predicted and observed is published. Where it does not, the absence is declared rather than concealed.
V.01
Predictions with full measurement closure
Eight of twelve releases have closure data. Mean gap: 5.6 % capacity at end-of-life. Bound: declared per release.
V.02
Predictions awaiting measurement
Three releases have pending measurement returns. Closure data expected on a 2026 · 11 cadence.
V.03
Predictions where measurement is structurally unavailable
One release covers a regime where reference data does not yet exist. The absence is declared in the release.
§ 04 / Documents
GS-2026 / SECT_04
Released documents.
Every released document conforms to the whitepaper template documented on Methodology § 06. Audit records are preserved alongside the document.
- D.01
Engagement charter
PAaaS-E.01
2026 · 06 · 01PDF - D.02
Methodology orientation
Sim-B v0.4
2026 · 06 · 08PDF - D.03
Cycle C.01 release
Battery property baseline
2026 · 07 · 02PDF - D.04
Cycle C.02 release
Operational envelope mapping
2026 · 08 · 06PDF
Real workspace renders the engagement's own documents. The sample above shows the expected release cadence and document classes for a battery engagement.
Closing
Workspace access.
The workspace renders live state for the engaged partner. To open an engagement and have a workspace provisioned, return to the Predictive Analysis page.