Skip to content
Predictive Analysis Platform
Workspace · v1.02026

Workspace.

Active engagements, prediction cycles, and conformant releases. The example below is a live Battery Life Cycle Prediction engagement under the Sim-B program.

Live preview · current engagement: Battery Life Cycle Prediction · F.01

  1. Cycles completed

    03

    of 06 planned

  2. Predictions released

    12

    all conformant

  3. Open assumptions

    02

    under review

  4. Next audit

    2026

    09

Status values shown are illustrative of an active workspace. Real engagements render live values.

§ 01 / Engagement

GS-2026 / SECT_01

Engagement profile.

Engagement profile.
Engagement IDPAaaS-E.01
ApplicationBattery Life Cycle Prediction
ProgramsSim-B (Simulation – Battery Systems) · QMS-B (Battery materials)
Engagement opened2026 · 06 · 01
Current cycleC.03 of planned C.06
Operating regimeCell-to-pack thermal · electrochemical response · lifecycle prediction
Whitepaper templateConformant (§7.6.1)
Validation disciplineApplied (§7.3.2 — six rules)
Methodology auditPending C.06 closure

§ 02 / Active prediction runs

GS-2026 / SECT_02

Prediction runs.

Each run carries a parameter set, a model version, a convergence state, and a published uncertainty bound. Runs without all four entries are flagged before they reach the customer surface.

Active prediction runs.
RunDateSolverModel versionStateUncertainty boundStatus
R.0122026 · 08 · 14Sim-B / DFT+MPSsim-b · v0.4.2Converged± 4.2 % capacityReleased
R.0112026 · 08 · 09Sim-B / DFT+MPSsim-b · v0.4.2Converged± 5.8 % capacityReleased
R.0102026 · 07 · 31Sim-B / DFTsim-b · v0.4.1Converged± 7.1 % capacityReleased
R.0092026 · 07 · 21Sim-B / DFTsim-b · v0.4.1Non-convergedLabelled (not silently discarded)

Sample workspace state. Real engagements show only the customer's own runs.

§ 03 / Validation summary

GS-2026 / SECT_03

Observed-vs-predicted closure.

Validation against measurement is the institutional standard. Where measurement data exists, the gap between predicted and observed is published. Where it does not, the absence is declared rather than concealed.

  1. V.01

    Predictions with full measurement closure

    Eight of twelve releases have closure data. Mean gap: 5.6 % capacity at end-of-life. Bound: declared per release.

  2. V.02

    Predictions awaiting measurement

    Three releases have pending measurement returns. Closure data expected on a 2026 · 11 cadence.

  3. V.03

    Predictions where measurement is structurally unavailable

    One release covers a regime where reference data does not yet exist. The absence is declared in the release.

§ 04 / Documents

GS-2026 / SECT_04

Released documents.

Every released document conforms to the whitepaper template documented on Methodology § 06. Audit records are preserved alongside the document.

  1. D.01

    Engagement charter

    PAaaS-E.01

    2026 · 06 · 01PDF
  2. D.02

    Methodology orientation

    Sim-B v0.4

    2026 · 06 · 08PDF
  3. D.03

    Cycle C.01 release

    Battery property baseline

    2026 · 07 · 02PDF
  4. D.04

    Cycle C.02 release

    Operational envelope mapping

    2026 · 08 · 06PDF

Real workspace renders the engagement's own documents. The sample above shows the expected release cadence and document classes for a battery engagement.

Closing

Workspace access.

The workspace renders live state for the engaged partner. To open an engagement and have a workspace provisioned, return to the Predictive Analysis page.